首页 | 本学科首页   官方微博 | 高级检索  
     

东北电网峰谷差及水电规划开发
引用本文:刘凤林,任井利.东北电网峰谷差及水电规划开发[J].水电能源科学,2000,18(2):66-68.
作者姓名:刘凤林  任井利
作者单位:桓仁发电厂,辽宁,桓仁,117201
摘    要:随着社会经济的发展和电力市场的变化,东北电网峰谷差不断加大,供需矛盾日益尖锐,规划水电开发项目,开发建设抽水蓄能、扩建混合抽水蓄能、扩建机组、实施老旧机组改造,以增加水电装机容量,提高系统调峰能力,满足电力市场需求。

关 键 词:东北电网  峰谷差  水电规划  开发建设
修稿时间:2000-02-23

The Difference between Peak and Valley of the Northeast Power Pool and Hydropower Planning and Development
LIU Feng-lin,REN Jing-li.The Difference between Peak and Valley of the Northeast Power Pool and Hydropower Planning and Development[J].International Journal Hydroelectric Energy,2000,18(2):66-68.
Authors:LIU Feng-lin  REN Jing-li
Abstract:With the development of society and economy and the change of the power market, the difference between peak and valley of the Northeast power pool is steadily increasing and the contradiction between supply and demand is becoming increasingly acute. It is therefore imperative to make plans for hydropower development projects and those for building pumped storage power stations, extending mixed pumped storage stations and pumped storage groups as well as innovating old ones so as to increase the hydropower installed capacity, improve the peak modulating capability and meet the demand of the power market.
Keywords:Northeast power pool  difference between peak and valley  hydropower planning  development and construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号