柔性工时约束下项目调度及其蚁群算法
引用本文:应瑛,寿涌毅.柔性工时约束下项目调度及其蚁群算法[J].计算机应用,2009,29(6):1527-1568.
作者姓名:应瑛  寿涌毅
作者单位:浙江大学 管理学院,杭州,310058
摘    要:针对软件工程项目调度问题,在考虑加班工时的情况下,提出了柔性工时约束下项目调度问题的数学模型,并设计了相应的蚁群算法。模型对项目人力资源的特殊性进行了分析,指出项目人力资源是一种特殊的可更新资源,在允许加班的情况下,人力资源构成特殊的柔性工时约束。针对所设计的数学模型,在并行项目进度生成机制基础上设计了蚁群算法,并通过算例进行验证与分析。

关 键 词:项目调度  工时约束  蚁群算法  project  scheduling  work-hour  constraint  ant  colony  algorithm
收稿时间:2008-12-15
修稿时间:2009-02-24

Ant colony algorithm for project scheduling problem under flexible work-hour constraints
YING Ying,SHOU Yong-yi.Ant colony algorithm for project scheduling problem under flexible work-hour constraints[J].journal of Computer Applications,2009,29(6):1527-1568.
Authors:YING Ying  SHOU Yong-yi
Affiliation:School of Management;Zhejiang University;Hangzhou Zhejiang 310058;China
Abstract:A new mathematical model for software engineering project scheduling was proposed. The model took into consideration the over-time of software engineers, which was regarded as a flexible work-hour constraint. The project human resources were analyzed in detail. As a type of special renewable resource, the human resource was added as a new constraint to the traditional resource constrained project scheduling problem. An ant colony algorithm based on parallel schedule generation scheme was suggested to solve this new flexible work-hour constrained project scheduling problem, and an instance was used to verify and analyze the solution.
Keywords:project scheduling  work-hour constraint  ant colony algorithm  