大断面水工隧洞下穿既有公路隧道沉降影响分析
引用本文:赵凯,崔允亮,李明照,李威明.大断面水工隧洞下穿既有公路隧道沉降影响分析[J].水利水电技术,2021,52(3):162-168.
作者姓名:赵凯  崔允亮  李明照  李威明
作者单位:1. 中国电建集团华东勘测设计研究院有限公司,浙江 杭州 311122; 2. 浙大城市学院,浙江 杭州 310015
基金项目:中国电建集团华东勘测设计研究院有限公司科研计划项目( KY2019-JG-41)
摘    要:针对某大断面水工隧洞下穿双线公路隧道工程,采用理论解方法,综合考虑大断面水工隧洞开挖引起的土层位移影响,提出了一种计算水工隧洞下穿引起上部既有公路隧道沉降位移值的计算方法。结合有限元模拟和实测数据对理论计算方法进行了可靠性验证,分析了既有双线公路隧道沉降影响范围大小及沉降位移规律。研究结果表明:三种方法所得公路隧道沉降曲线相互吻合,近似呈现正态分布,最大沉降值均位于分洪隧洞下穿轴线处;穿越引起的公路隧道下沉区域主要分布在穿越中心点两侧各23 m的范围,而在下沉区域外隧道出现局部的上浮变形;公路隧道总体沉降变形较小,结构稳定安全。

关 键 词:水工隧洞  公路隧道  垂直下穿  沉降分析  理论计算  
收稿时间:2020-07-05

Analysis on settlement impact from under-crossing construction of large-section hydraulic tunnel through existing highway tunnel
ZHAO Kai,CUI Yunliang,LI Mingzhao,LI Weiming.Analysis on settlement impact from under-crossing construction of large-section hydraulic tunnel through existing highway tunnel[J].Water Resources and Hydropower Engineering,2021,52(3):162-168.
Authors:ZHAO Kai  CUI Yunliang  LI Mingzhao  LI Weiming
Affiliation:1. PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,Zhejiang,China; 2. Zhejiang University City College,Hangzhou 310015,Zhejiang,China
Abstract:Aiming at the under-crossing construction of a large cross-section hydraulic tunnel through a double-line highway tunnel,the displacement of soil layer caused by the impact from the excavation of the large-section hydraulic tunnel is comprehensively considered with the relevant theoretical solution method,and then a method for the calculation of the settlement displacement of an existing highway tunnel caused by the under-crossing of a hydraulic tunnel is put forward herein. Combined with the finite element simulation and the related measured data,the reliability of the theoretical calculation method is verified,while the impacting range of the settlement and the law of the settlement displacement for the existing double-line highway tunnel are analyzed as well. The study result shows that the settlement curves of the highway tunnel obtained by three methods are consistent with each other and all approximately exhibit normal distributions. The maximum settlement values are all located at the undercrossing axis of the hydraulic tunnel,from which the subsidence area of the highway tunnel caused by the under-crossing is mainly distributed in the ranges of 23 m on both the sides of the crossing center point,while local uplift-deformation of the tunnel occurs outside the subsidence area. Generally,the total settlement deformation of the highway tunnel is less and the structure of it is stable and safe.
Keywords:hydraulic tunnel  highway tunnel  vertical under-crossing  settlement analysis  theoretical calculation  