Maintenance duration estimate for a DEMO fusion power plant,based on the EFDA WP12 pre-conceptual studies
Affiliation:1. EURATOM/Culham Center Fusion Energy, CulhamScience Centre, OX14 3DB Abingdon, UK;2. EFDA Close Support Unit Garching, Boltzmannstaße 2, D-85748 Garching Bei München, Germany;1. International Fusion Energy Research Centre (IFERC) for Broader Approach, Rokkasho, Japan;2. Power Plant Physics and Technology, European Fusion Development Agreement (EFDA), Garching, Germany;3. Fusion Research and Development Directorate, Japan Atomic Energy Agency (JAEA), Rokkasho, Japan;1. Department of Nuclear Engineering, Seoul National University 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Republic of Korea;2. National Fusion Research Institute, 169-148, Yuseong-gu, Daejeon 305-806, Republic of Korea;1. ENEA, Unità Tecnica Fusione, ENEA C. R. Frascati, Italy;2. KIT, Institute of Neutron Physics and Reactor Technology (INR) – KIT, Germany
Abstract:The erosion and high neutron flux in a fusion power plant results in the need for frequent remote replacement of the plasma facing components. This is a complex and time consuming remote handling operation and its duration directly affects the availability and therefore the commercial viability of the power plant.A tool is needed to allow the maintenance duration to be determined so that developments in component design can be assessed in terms of their effect on the maintenance duration. This allows the correct balance to be drawn between component cost and performance on the one hand and the remote handling cost and plant availability on the other.The work to develop this tool has begun with an estimate of the maintenance duration for a fusion power plant based on the EFDA DEMO WP12 pre-conceptual design studies 1]. The estimate can be readily adjusted for changes to the remote maintenance process resulting from design changes. The estimate uses data extrapolated from recorded times and operational experience from remote maintenance activities on the JET tokamak and other nuclear facilities.The Power Plant Conceptual Study from 2005 2] proposes that commercial viability of a power plant would require an availability of 75% or above. Results from the maintenance estimate described in this paper suggest that this level of availability could be achieved for the planned maintenance using a highly developed and tested remote maintenance system, with a large element of parallel working and challenging but feasible operation times.
Keywords:DEMO  PPP&T  Remote handling  Maintenance duration  Operational efficiency
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号