首页 | 本学科首页   官方微博 | 高级检索  
     

尼那水电站贯流式机组转子结构与装配
引用本文:景翔,李华梅.尼那水电站贯流式机组转子结构与装配[J].广西水利水电,2007(4):32-33,42.
作者姓名:景翔  李华梅
作者单位:广西融水县古顶水电站,广西,融水,545300
摘    要:尼那水电站贯流式机组转子支架与磁轭联接为辐射状联接,这种新形式的转子支架能很好地保持转子圆度.为此,着重介绍了这种转子安装的技术及方法,指出其装配工艺及要求.

关 键 词:贯流式机组  转子结构  装配工艺
文章编号:1003-1510(2007)04-0032-02
收稿时间:2007-05-22
修稿时间:2007-05-22

Bulb turbine generator rotor structure and assembly of Nina HPP
JING Xiang,LI Hua-mei.Bulb turbine generator rotor structure and assembly of Nina HPP[J].Gx Water Resources & Hydropower Engineering,2007(4):32-33,42.
Authors:JING Xiang  LI Hua-mei
Affiliation:Guding Hydropower Plant, Rongshui 545300, China
Abstract:The rotor spider and rotor rim of the bulb turbine generator of Nina Hydropower Plant are of radial connection structure. This new type of rotor spider structure can maintain well the roundness of rotor. Emphasis is put on the introduction of the erection technique and method of this type of rotor. The assembly technology and requirements are also introduced.
Keywords:Bulb turbine generator  rotor structure  assembly technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号