曹娥江闸前大桥直线段支架基础施工技术
引用本文:刘绍堂,苏轩.曹娥江闸前大桥直线段支架基础施工技术[J].广州建筑,2009,37(2).
作者姓名:刘绍堂  苏轩
作者单位:1. 河南工程学院土木工程系,郑州,451191
2. 安阳大众煤业有限责任公司,安阳,455141
摘    要:介绍绍兴曹娥江大闸闸前大桥水中主桥直线段支架基础的施工技术方案、施工操作要点,总结了强涌潮条件下用支架法施工的经验.实践表明用冲击型打桩锤取代弹簧锤进行管桩的"双控"插打具有优越性.

关 键 词:强涌潮  直线段  施工技术  曹娥江大闸闸前大桥

Techniques in Foundation Construction of the Straight Part of the Bridge Before Shaoxing Cao' ejiang Sluice Gate
Authors:LIU Shao-tang  SU xuan
Affiliation:1. Department of Civil Engineering;Henan Institute of Engineering;Zhengzhou 451191;2. Anyang Dazhong Coal Co.;Ltd.;Anyang 455141
Abstract:The paper sums up the techniques in foundation construction of the straight part of the Bridge before Shaoxing Cao' ejiang Sluice Gate, analysis the key point of the construction under strong storm surge condition, and gives experience of the practice. It is shown that the " double-control" pilling method which takes use of impacthammer instead of spring hammer has great advantage.
Keywords:storm surge  straight part  construction technique  Bridge before Shaoxing Cao' ejiang  