峡江水利枢纽工程安全监测系统布置及施工期 观测资料分析
引用本文:马超,熊平,熊国文.峡江水利枢纽工程安全监测系统布置及施工期 观测资料分析[J].江西水利科技,2015(2):148-152.
作者姓名:马超  熊平  熊国文
作者单位:1. 南京水利科学研究院,江苏 南京,210024
2. 江西省水利水电建设有限公司,江西 南昌,330025
摘    要:简要介绍峡江水利枢纽工程监测仪器的布置、选型,并对施工期取得的坝基扬压力、基岩变形、温度以及重力坝接缝变形等监测资料的变化特征进行了初步分析.结果表明:峡江水利枢纽工程中主要建筑物监测量变化特征表现正常.

关 键 词:安全监测:施工期  资料分析  峡江水利枢纽

Dam safety monitoring data analysis during construction and safety monitoring system deployment of Xiajiang Water Control Project
MA Chao,XIONG Ping and XIONG Guo-wen.Dam safety monitoring data analysis during construction and safety monitoring system deployment of Xiajiang Water Control Project[J].Jiangxi Hydraulic Science & Technology,2015(2):148-152.
Authors:MA Chao  XIONG Ping and XIONG Guo-wen
Affiliation:MA Chao;XIONG Ping;XIONG Guo-wen;Nanjing Hydraulic Research Institute;Jiangxi Provincial Hydraulic and Hydro-electric Construction Co., Ltd;
Abstract:The deployment and types selection of monitoring instruments was introduced in brief,and the monitoring data during construction was analyzed including uplift pressure in dam foundation,deformation in basement,temperature and joint deformation of gravity dam.The results showed that the characteristic of the majority of monitoring data in this hydro-junction is normal.
Keywords:Safety monitoring  Construction period  Data analysis