土压平衡盾构始发掘进施工技术
引用本文:王吉华. 土压平衡盾构始发掘进施工技术[J]. 山西建筑, 2009, 35(9): 335-336
作者姓名:王吉华
作者单位:中铁十八局集团第五工程有限公司地铁工程公司,天津,300450
摘    要:结合沈阳市地铁一号线云沈(云峰北街站-沈阳站)盾构区间土压平衡盾构始发掘进施工技术,介绍了土压平衡盾构始发的技术要点,并归纳总结了盾构始发掘进常见问题的对策和预防措施,同时提出了新的想法和建议。

关 键 词:盾构  始发掘进  施工技术

The technique of earth pressure balance shield original heading construction
WANG Ji-hua. The technique of earth pressure balance shield original heading construction[J]. Shanxi Architecture, 2009, 35(9): 335-336
Authors:WANG Ji-hua
Affiliation:WANG Ji-hua
Abstract:Combining with the technique of earth pressure balance shield original heading construction of subway No.1 line Yun-Shen shield zone (Yunfeng north street station-Shenyang station) in Shenyang city,the technique points of earth pressure balance shield original heading were introduced,the countermeasures and preventive measures of common problems of shield original heading were concluded,and the new ideas and suggestions were provided.
Keywords:shield  original heading  construction technique  