1 000 MW 超超临界机组管道吊装工艺
引用本文:王志军.1 000 MW 超超临界机组管道吊装工艺[J].电力建设,2010,31(10):87-89.
作者姓名:王志军
作者单位:天津电力建设公司--自编邮箱
摘    要:1 000 MW超超临界机组的工质流量大、温度高、压力大,其管道采用新型钢种,管道更长、更重,增加了管道吊装施工难度。文章介绍了宁海二期1 000 MW超超临界机组主蒸汽管道、高温再热蒸汽管道、冷段管道和高压给水管道的吊装施工工艺,可为超超临界机组安装工程提供参考。

关 键 词:1000MW超超临界机组  管道  吊装  施工  工艺
收稿时间:2010-02-09
修稿时间:2010-07-28

Pipeline Hoisting Technology for 1000 MW Ultra Supercritical Boiler Unit
WANG Zhi-jun.Pipeline Hoisting Technology for 1000 MW Ultra Supercritical Boiler Unit[J].Electric Power Construction,2010,31(10):87-89.
Authors:WANG Zhi-jun
Affiliation:WANG Zhi-jun (Tianjin Launch Electric Power Maintenance Co.Ltd.,Tianjin 300012,China)
Abstract:The 1 000 MW ultra supercritical unit has large flow,high temperature and high pressure.Its pipe system is made of a new type of steel and is large in both length and weight,which increases difficulties for hoisting.The paper introduces the design of hoisting technology of pipes,including main steam pipe,high-temperature reheat steam pipe,cooling pipe and high pressure water supply pipe,which can used as a reference for installation of ultra supercritical unit.
Keywords:1000 MW ultra supercritical unit  pipeline  hoisting  construction  technology