李家峡水电站机电设计
引用本文:吕六和.李家峡水电站机电设计[J].水力发电,1997(6):51-53.
作者姓名:吕六和
作者单位:西北勘测设计研究院
摘    要:李家峡水电站接入系统与电气主接线按330kV一级电压与5回出线设计,发电机与变压器组合方式采用单元接线,330kV侧采用3/2断路器接线。机组与附属设备方面:水轮机为竖轴混流式,机型为HLD203-LJ-603;发电机为半伞式结构,型号为SF400-48/12800;调速器采用并联PID微机电液型;发电机采用自并激静止可控硅励磁,励磁调节器为PID数字式。发电机采用HEK6型户内强风冷SF6断路器。主变选用双线圈三相整体式,型号为SSP7-450000/330。开关站采用户内GIS方案。电站采用以计算机监控为主,PLC功能子系统为辅的监控模式。机组为双排布置,上游2台下游3台。

关 键 词:水电站  机电设计  发电设备  机电设备

Mechanical and electrical design of Lijiaxia Hydropower Station
Lu Liuhe.Mechanical and electrical design of Lijiaxia Hydropower Station[J].Water Power,1997(6):51-53.
Authors:Lu Liuhe
Affiliation:Northwest China Investigation and Design Institute
Abstract:In the electric master connection of Lijiaxia Hydropower Station,the switch on system is designed on one voltage of 330kV and 5 outgoing loops and the composition of power generator and transformer is connected by unit wiring.The generating unit and ancillary equipment are as follows:vertical shaft mixed flow turbine of HLD203 LJ 603;semi umbrella type generator of SF400 48/12800;the parallel PID computer electro hydraunc governor,auto exciting static silicon controlled excitation system for generator,PID digital excitation governor;SF6 indoor strong wind cool fuse of HEK6.The main transformer is a double coil three phase integral system with a type of SSP7 450000/330.The switch station is a indoor GIS .The hydropower staion takes computer supervisory control system as main and concurrent with PLC sub system.The generating units are arranged in two rows,that is,two in upstream side and three in downstream side.
Keywords:Lijiaxia Hydropower    Station  Mechanical and electrical design  Master connection  generating unit  high  voltage    electric equipment  supervisory control  arrangement