首页 | 本学科首页   官方微博 | 高级检索  
     

广州新电视塔钢管柱混凝土浇筑施工技术
引用本文:吴学勇. 广州新电视塔钢管柱混凝土浇筑施工技术[J]. 广东土木与建筑, 2009, 16(11): 32-34
作者姓名:吴学勇
作者单位:广州建筑工程监理有限公司,广州,510030
摘    要:广州新电视塔主体结构高454m,外框筒钢管柱混凝土浇筑根据工程不同施工阶段的实际情况采用不同方法进行施工,保证了施工进度和质量。

关 键 词:钢管柱  混凝土浇筑  布料杆

Pouring Construction Technique of Steel Tube Columns Concrete Applied in Guangzhou New TV Tower
Wu Xueyong. Pouring Construction Technique of Steel Tube Columns Concrete Applied in Guangzhou New TV Tower[J]. Guangdong Architecture Civil Engineering, 2009, 16(11): 32-34
Authors:Wu Xueyong
Affiliation:Wu Xueyong (Guangzhou Construction Engineering Supervision Co.,Ltd Guangzhou 510030,China)
Abstract:Outer frame tube steel tube columns concrete pouring applied in the Guangzhou New TV Tower which has the 454-meter high host tower body,using different method constution technique according to conditions in different construction stage to ensure construction progress and quality.
Keywords:steel tube columns  concrete pouring  placing boom  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号