首页 | 本学科首页   官方微博 | 高级检索  
     

安徽白塔河何庄段穿河工程设计洪水计算
引用本文:何翠敏.安徽白塔河何庄段穿河工程设计洪水计算[J].水科学与工程技术,2014(6):29-32.
作者姓名:何翠敏
作者单位:安徽省滁州市白蚁防治研究所,安徽 滁州,239000
摘    要:针对管道防洪安全,对设计洪水采用"84"法及"62"法计算上游设计暴雨和入库洪水,根据调洪演算成果及区间洪水,推求白塔河何庄段设计洪峰流量、水位,为管道工程穿河方案设计提供依据。

关 键 词:安徽白塔河  何庄段  穿河工程  设计洪水

Calculation Example of Design Flood for Crossing Project in Anhui Baita River Hezhuang
HE Cui-min.Calculation Example of Design Flood for Crossing Project in Anhui Baita River Hezhuang[J].Water Sciences and Engineering Technology,2014(6):29-32.
Authors:HE Cui-min
Affiliation:HE Cui-min ( Chuzhou City Research on the Prevention and Control of Termites of A nhui Province, Chuzhou 239000, China)
Abstract:In order to ensure the safety of flood control, the method of "84" and "62" method was using to calculate the upstream design storm and reservoir flood, according to the results of flood regulating calculation, and interval flood, the de-sign flood peak discharge and water level of Baita River Hezhuang section was developed, it provides a basis for project de-sign of pipeline engineering crossing river.
Keywords:Anhui Baita River  Hezhuang  cross river project  design flood
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号