摘    要:GIS是先进的电力设备,在运行中一旦发生故障,检修困难、时间长.因此需要对GIS设备的选型、监造、包装、运输、贮存、现场安装、验收、检修和运行维护等方面提出全过程管理的要求.通过一些实例,介绍GIS设备的全过程管理,供变电同行参考.

关 键 词:GIS设备  全过程管理

Discuss on GIS Equipment Full-process Management
Lian Jing.Discuss on GIS Equipment Full-process Management[J].Guangdong Power Transmission Technology,2011,13(1):41-43.
Authors:Lian Jing
Affiliation:Guangdong Power Grid Corporation Meizhou Power Supply Bereau Lian Jing
Abstract:GIS is a kind of advanced power equipment. However, if once fault happens in operation, restoration would be very difficult and lasting. Therefore a full-process management on type selection, manufacturing monitor, packing and shipping, site erection, acceptance check, overhaul, maintenance and operation is needed. Here with some examples, GIS full-process management is introduced for the reference of substation colleagues.
Keywords:GIS equipment Full-process management