首页 | 本学科首页   官方微博 | 高级检索  
     

广珠西线珠江特大桥主墩承台钢板桩围堰施工
引用本文:郭文伟. 广珠西线珠江特大桥主墩承台钢板桩围堰施工[J]. 山西建筑, 2006, 32(13): 337-338
作者姓名:郭文伟
作者单位:汕头市潮阳建筑安装工程总公司广州分公司,广东广州510600
摘    要:结合工程概况,分析确定了承台施工方案,介绍了主墩承台钢板桩围堰的施工工艺,并对主要构件的受力做了验算,结果表明达到了类似地上作业的效果,解决了江水地区承台施工的问题。

关 键 词:主墩承台 内撑系统 钢板桩 围堰
收稿时间:2005-12-24

Construction of steel-sheet-pile cofferdam in main pier bearing platform work of Zhujiang Bridge
GUO Wen-wei. Construction of steel-sheet-pile cofferdam in main pier bearing platform work of Zhujiang Bridge[J]. Shanxi Architecture, 2006, 32(13): 337-338
Authors:GUO Wen-wei
Abstract:Combined with general engineering situations the construction scheme of bearing platform is determined. The construction technology of steel-sheet-pile cofferdam of bearing platform is also introduced. Force analysis and checking computation show construction meet anticipated effect, which resolve bearing platform construction problems in river region.
Keywords:bearing platform of main pier   internal support system   steel-sheet-pile   cofferdam
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号