首页 | 本学科首页   官方微博 | 高级检索  
     

±1 100 kV长距离直流输电线路接地线感应电流分布及拆除方案
引用本文:李慧奇,任红昕,郭鑫,刘承志,张永奈,刘大平.±1 100 kV长距离直流输电线路接地线感应电流分布及拆除方案[J].中国电力,2019,52(7):92-98.
作者姓名:李慧奇  任红昕  郭鑫  刘承志  张永奈  刘大平
作者单位:1. 华北电力大学 河北省输变电设备安全防御重点实验室, 河北 保定 071003;2. 国网安徽省电力有限公司, 安徽 合肥 230022
摘    要:临近1 000 kV 同塔双回交流输电线路架设输电线路,挂接地线是防止感应电危害施工人员安全的有效措施。为了确定施工中输电线路接地线感应电流分布和接地线拆除方案,基于ATP-EMTP电磁暂态程序,建立了±1 000 kV 吉泉直流输电线路长距离并行同塔双回1 000 kV 交流输电线路的模型。计算了施工中直流线路中的感应电流,分析了线间距离、并行长度、线路高度和土壤电阻率等因素对感应电流的影响。最后,针对地线的拆除顺序提出了相应的接地线拆除方案。

关 键 词:特高压直流  输电线路  接地线  感应电流  地线拆除  EMTP  
收稿时间:2018-05-22
修稿时间:2018-09-14

Distribution and Demolition of Induced Current in Grounding Wire of ±1 100 kV Long Distance DC Transmission Lines
LI Huiqi,REN Hongxin,GUO Xin,LIU Chengzhi,ZHANG Yongnai,LIU Daping.Distribution and Demolition of Induced Current in Grounding Wire of ±1 100 kV Long Distance DC Transmission Lines[J].Electric Power,2019,52(7):92-98.
Authors:LI Huiqi  REN Hongxin  GUO Xin  LIU Chengzhi  ZHANG Yongnai  LIU Daping
Affiliation:1. Hebei Provincial Key Laboratory of Power Transmission Equipment Security Defense, North China Electric Power University, Baoding 071003, China;2. State Grid Anhui Electric Power Co., Ltd., Hefei 230022, China
Abstract:Transmission lines with certain length are erected nearby the 1 000 kV double-circuit AC transmission lines, and the usage of grounding wires is an effective measure to prevent the safety of the construction personnel from being injured by inductive electricity. It aims at analyzing the induced current distribution of the grounding wires in the construction and the demolition scheme of grounding wires. Based on the ATP-EMTP electromagnetic transient program, a model of the long distance ±1 100 kV Jiquan DC transmission lines parallel with double circuits on the same tower of 1 000 kV AC transmission lines is established. The induced currents in the DC transmission lines in the construction are calculated. The influence of the inter line distance, parallel length, line height and soil resistivity on the induced currents are analyzed. Finally, the corresponding grounding wire removal plan for the demolition sequence of ground wires is proposed.
Keywords:UHVDC  transmission line  grounding wire  induced current  ground wire demolition  EMTP  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏