西气东输(郑州)穿越黄河管道封固技术
引用本文:韩革委,陈光,杨声贵,邵春英,刘振兴. 西气东输(郑州)穿越黄河管道封固技术[J]. 钻井液与完井液, 2004, 21(6): 75-76
作者姓名:韩革委  陈光  杨声贵  邵春英  刘振兴
作者单位:华北石油管理局固井工程处四分处,河北任丘
摘    要:西气东输(郑州)穿越黄河管道封固工程全长3580 m,采用双层管线,外层保护管道内径为1800 mm,内管主输气管道外径为1016 mm.要求既要使环形空间上方1/6高度不被封固,用来通过通讯光缆,又要使环形空间的其它部分封固均匀,保护主输气管道.该工程由于注灰量大、施工时间长,浆体流动性、稳定性要求高、管内浆体高度难以控制和主输气管道保护要求严格而使施工难度大大增加.通过确定不同阶段使用的水泥浆配方、合理的施工方案、制作控制管内浆体高度的特殊封头和采用先进的注浆设备,抓好施工各环节,使这一大直径、大注灰量、长距离水平管道封固获得成功.同时提出了工程上有待改进的不足之处.

关 键 词:固井技术  水泥浆  水泥浆添加剂  西气东输  穿越黄河管道
文章编号:1001-5620(2004)06-0075-02

Cementing technology of West to East Project (Zhengzhou) pipeline through Huanghe River
HAN Ge-wei,CHEN Guang,YANG Sheng-gui,SHAO Chun-ying and LIU Zhen-xing The first author's address: Cementing Engineering. Cementing technology of West to East Project (Zhengzhou) pipeline through Huanghe River[J]. Drilling Fluid & Completion Fluid, 2004, 21(6): 75-76
Authors:HAN Ge-wei  CHEN Guang  YANG Sheng-gui  SHAO Chun-ying  LIU Zhen-xing The first author's address: Cementing Engineering
Affiliation:HAN Ge-wei,CHEN Guang,YANG Sheng-gui,SHAO Chun-ying and LIU Zhen-xing The first author's address: Cementing Engineering Department of Huabei Petroleum Administration Bureau,Renqiu,Hebei
Abstract:The total length of West to East Project pipeline, Zhe.ngzhou section cementing engineering is 3580 m. Double pipeline was laid with the inner diameter of the outer protective pipe of" 1800 mm and the outer diameter of the inner main gas transporting pipe of 1016 mm. It is required the upper 1/6 annular space not to be cemented for running the communication cable, and the remained part should be cemented evenly to protect the transportation pipe. Due to reasons of high cement injecti on rate, long operating time, slurry flowability and stability, difficult control of slurry height in tu be and strict protection require ments for the main pipeline, cementing operation becomes more challengeable. Different cement slurry compositions were used in different intervals. With reasonable operational procedure, using special head to control slurry height in tube and improved slurry injection tools, the cementing job was carried out successfully. At the same time, deficiencies to be improved were presented.
Keywords:cementing technology   cement slurry   cement additive   West to East Project   pipeline through Huanghe River