首页 | 本学科首页   官方微博 | 高级检索  
     

VSL SSI 2000 斜拉索体系施工质量控制
引用本文:刘耀武. VSL SSI 2000 斜拉索体系施工质量控制[J]. 施工技术, 2007, 36(3): 34-36
作者姓名:刘耀武
作者单位:上海建泰预应力工程公司,上海,200235
摘    要:斜拉桥虽有跨越能力大、结构经济合理、外型轻巧美观、可无支架施工等优点,但在斜拉索的安装施工中存在着对索力控制精度高、施工质量对斜拉索的拉索腐蚀退化和振动疲劳衰减的影响大等多方面的挑战。本文着重介绍VSL SSI 2000斜拉索体系在施工中的索力控制措施以及对影响斜拉索结构耐久性两大因素的质量保证措施。

关 键 词:斜拉索  索力  防腐  疲劳
文章编号:1002-8498(2007)03-0034-03
修稿时间:2006-06-16

Construction Quality Control of VSL SSI 2000 Cable-stay System
LIU Yao-wu. Construction Quality Control of VSL SSI 2000 Cable-stay System[J]. Construction Technology, 2007, 36(3): 34-36
Authors:LIU Yao-wu
Abstract:Cable-stayed bridge has many advantages,such as wide span,economic structure, beautiful modeling,and no formwork construction.However it also has many challenges,including high control accuracy of cable force during the installation of cable-stay system,and great influence of construction quality on cable corrosion and vibration fatigue.The author introduces the construction control measures for cable of VSL SSI 2000 cable-stay system,and presents the quality control measures which affect the durability of cable-stay system.
Keywords:cable-stay  cable force  anticorrosion  fatigue  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号