首页 | 本学科首页   官方微博 | 高级检索  
     

混凝-BAF处理黑臭水体中试实验研究
引用本文:刘君臣,张竹青,冯志江,刘喆,刘瑞强,戴捷.混凝-BAF处理黑臭水体中试实验研究[J].水处理技术,2021,47(3):114-118.
作者姓名:刘君臣  张竹青  冯志江  刘喆  刘瑞强  戴捷
作者单位:长江大学化学与环境工程学院,434023;湖北山叶环保科技股份有限公司,434000 湖北荆州
基金项目:国家自然科学基金(21173026);湖北省自然科学基金重点项目(2013CFA107);荆州市科技局项目(2019006)。
摘    要:以实际黑臭水体为样本,经混凝预处理后进行曝气生物滤池(BAF)的中试实验.结果表明,BAF系统挂膜启动时间为21 d,反冲洗周期为12 d;当停留时间1 h,气水体积比4:1时,系统运行状态最佳,COD、NH4+-N、TP去除率分别达到82%、90%、42%,出水满足GB 18918-2002一级A标准.探究污染物降解...

关 键 词:混凝  曝气生物滤池  黑臭水体  三维荧光光谱

Pilot-scale Experimental Study on Black Odor Water by Coagulation-BAF
LIU Junchen,ZHANG Zhuqing,FENG Zhijiang,LIU Zhe,LIU Ruiqiang,DAI Jie.Pilot-scale Experimental Study on Black Odor Water by Coagulation-BAF[J].Technology of Water Treatment,2021,47(3):114-118.
Authors:LIU Junchen  ZHANG Zhuqing  FENG Zhijiang  LIU Zhe  LIU Ruiqiang  DAI Jie
Affiliation:(College of Chemistry and Environmental Engineering,Yangtze University,434023;Yangtze University,Hubei Shanye Environmental Protection Technology Co.,Ltd,434000:Jingzhou,China)
Abstract:The pilot study of BAF was carried out after coagulation pretreatment with actual black and odorous water.The results showed that the startup time of the membrane culturing was 21 days and the backwash cycle was 12 days.When the residence time is 1 h and the gas-water ratio is 4:1,the system runs in the best state(COD,ammonia nitrogen and TP removal rates reach 82%,90%and 42%,respectively),and the effluent meets GB18918-2002 level 1 A standard.It was found by exploring the degradation process of pollutants that COD degradation mainly occurred at a height of 0~60 cm in the packing layer,while ammonia nitrogen degradation mainly occurred at a range of 60~120 cm.The 3 D-EEM showed that there were four characteristic fluorescence peaks in raw water,and the BAF system significantly reduced the intensity of the characteristic fluorescence peaks.
Keywords:coagulation  biological aerated filter  black odor water  3D-EEM
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号