首页 | 本学科首页   官方微博 | 高级检索  
     

基于数学规划算法的单桩沉降计算分析研究
引用本文:刘红军,上官士青,朴春德,姜德鸿. 基于数学规划算法的单桩沉降计算分析研究[J]. 岩土工程学报, 2012, 34(5): 868-873
作者姓名:刘红军  上官士青  朴春德  姜德鸿
作者单位:1.中国海洋大学环境科学与工程学院,山东 青岛 266100; 2. 中国矿业大学资源与地球科学学院,江苏 徐州 221116; 3. 青岛市勘察测绘研究院,山东 青岛 266032
基金项目:国家自然科学基金项目(41072216);博士点基金资助项目(20100132110001)
摘    要:基于荷载传递法的土弹簧模型,提出了新假设,并建立了用于单桩沉降计算的数学规划模型。该数学模型以离散的最小势能方程为目标函数,桩顶荷载为约束条件,拟解决如何对各土弹簧进行荷载分配使整个系统势能最小的数学问题。不同于传统的土弹簧模型,论文提出的模型假设某一桩单元沉降值为该桩单元顶部平面沉降与底部平面沉降的平均值。通过算例验证,文章推出的计算方法可行有效,计算得出的 Q s 曲线、轴力分布与实测数据吻合较好,并对比发现在桩单元较少的情况下,通过该数学规划模型求解单桩沉降可以达到比位移协调法更高的精度。

关 键 词:单桩沉降  荷载传递法  土弹簧模型  数学规划  
收稿时间:2011-03-14

Calculation and analysis of single pile settlement based on mathematical programming algorithm
LIU Hong-jun,SHANGGUAN Shi-qing,PIAO Chun-de,JIANG De-hong. Calculation and analysis of single pile settlement based on mathematical programming algorithm[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(5): 868-873
Authors:LIU Hong-jun  SHANGGUAN Shi-qing  PIAO Chun-de  JIANG De-hong
Affiliation:1. College of Environmental Science and Engineering, China University of Ocean, Qingdao 266100, China; 2. The School of Resource and Earth Science, China University of Mining and Technology, Xuzhou 221116, China; 3. Qingdao Geotechnical Investigation and Surveying Research Institute, Qingdao 266032, China
Abstract:Based on the soil spring model of the load transfer method,a new assumption is proposed,and a mathematical programming model for calculating single pile settlement is established.In the mathematical model,the principle of the minimum potential energy is used as the objective function and the working load at the top of the pile is used as constraints,which is a mathematical approach to find how to distribute the load of soil spring to make the whole system potential energy minimum.Different from the traditional soil spring model,the proposed model defines the element value of a pile settlement as the average value of the top and bottom plane settlements of that pile element.Validated by an example,the Q-s curve calculated by the mathematical programming model and the measured data are in good agreement,which illustrates the proposed method is feasible and effective.And a comparison with the displacement coordination method shows that the proposed method has higher precision under the condition of less subdivision element.
Keywords:single pile settlement  load transfer method  soil spring model  mathematical programming
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号