Progress on the heating and current drive systems for ITER |
| |
Authors: | J. Jacquinot F. Albajar B. Beaumont A. Becoulet T. Bonicelli D. Bora D. Campbell A. Chakraborty C. Darbos H. Decamps G. Denisov R. Goulding J. Graceffa T. Gassmann R. Hemsworth M. Henderson G.T. Hoang T. Inoue N. Kobayashi P.U. Lamalle K. Watanabe |
| |
Affiliation: | 1. Cabinet of High Commissioner for Atomic Energy, CEA Gif-sur-Yvette, St Paul-lez-Durance, France;2. ITER Cadarache JWS, F-13108 St Paul-lez-Durance, France;3. Fusion for Energy, c/Josep Pla, No. 2, Torres Diagonal Litoral, Edificio B3, 08019 Barcelona, Spain;4. CEA, IRFM, F-13108 St Paul-lez-Durance, France;5. JAEA, 801-1 Mukouyama, Naka-shi, Ibaraki-ken 311-0193, Japan;6. US ITER Project Office, Oak Ridge National Laboratory, P.O. Box 2008, 1055 CM, MS 6483, Oak Ridge, TN 37831-6483, USA;7. ITER India, A29, Sector 25, GIDC, Gandhinagar, Gujarat, India;8. Institute of Applied Physics, 60360 Nizhny Novgorod, Russian Federation;9. UKAEA Fusion, Culham, Abingdon, Oxon, OX14 3DB, UK;10. Consorzio RFX, Euratom-ENEA Association, Corso Stati Uniti 4, I-35127, Italy |
| |
Abstract: | The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|