输水隧洞穿越断层破碎带施工力学效应分析
引用本文:荣晓洋,王述红,关永平,杨昊. 输水隧洞穿越断层破碎带施工力学效应分析[J]. 地下空间与工程学报, 2011, 7(Z2): 1615-1618,1637
作者姓名:荣晓洋  王述红  关永平  杨昊
作者单位:东北大学资源与土木工程学院,沈阳,110819
基金项目:中央高校基本科研业务费,国家自然科学基金,辽宁省自然科学基金
摘    要:水利工程中的大坝、输水隧洞、泄水建筑、铁路与公路隧道等均会遇到断层;本文以大伙房水库输水工程27+ 500 m~27+ 560 m断面破碎断层为工程背景,建立三维有限元数值模型,进行了断层破碎带施工的围岩力学效应分析.研究表明:断层破坏了原岩体介质的连续性,使水平及垂直应力分布失去对称性,出现明显的“偏压”现象.在断层...

关 键 词:断层  破碎带  数值模拟  稳定性分析

Analysis on Mechanical Effect of the Water Conservancy Tunnel Passing through Fault Fracture Zone
Rong Xiaoyang,Wang Shuhong,Guan Yongping,Yang Hao. Analysis on Mechanical Effect of the Water Conservancy Tunnel Passing through Fault Fracture Zone[J]. Chinese Journal of Underground Space and Engineering, 2011, 7(Z2): 1615-1618,1637
Authors:Rong Xiaoyang  Wang Shuhong  Guan Yongping  Yang Hao
Affiliation:(Institute of Resource and Civil Engineering,Northeast University,Shenyang 110819,China)
Abstract:Dams of water conservancy project,convey tunnels and discharge water constructions,railways and highway tunnels may encounter faults.This paper is based on fault fracture zone of Dahuofang water conveyance project at 27 + 500m ~ 27 + 560 m as engineering background,to set up three-dimensional finite element numerical model and carry on numerical simulation of influence of construction in fault fracture zone on stability of surrounding rock.Research shows that the faults destroy the continuity of original rock medium and the symmetry of horizontal and vertical stress distribution,so the apparent ’bias’ appears.The appearance of high shear stress area in the arch foot and sidewall where the faults pass,causes internal force of the primary support area increasing by 120~130%,and leads to increase of great displacement of the arch foot and sidewall.Therefore,it is suggested that the advanced support measures should be taken(including consolidation grouting,leading anchoring and advanced small catheter installation) during construction in the fault fracture zone and the secondary lining should follow the primary support construction closely,to make full use of time space effect in order to maximize control of deformation at cavern construction stage to ensure the stability and safety of the work.
Keywords:fault  fracture zone  numerical simulation  stability analysis