首页 | 本学科首页   官方微博 | 高级检索  
     

焦炉装煤操作优化
引用本文:张俊,靳迎武,刘思沛,苏战伟,向宇. 焦炉装煤操作优化[J]. 甘肃冶金, 2013, 35(1): 84-85,102
作者姓名:张俊  靳迎武  刘思沛  苏战伟  向宇
作者单位:安阳钢铁股份有限公司焦化厂,河南安阳,455000
摘    要:本文针对部分炭化室推焦电流大、装煤"缺角"等问题,通过对装煤操作系统进行优化、改进处理,使装煤量提高0.5~1吨/炉,装煤无"缺角",降低吨焦煤气消耗量。

关 键 词:装煤  操作  缺角  优化

Optimization of the Loading Coal Operation
ZHANG Jun , JIN Ying-wu , LIU Si-pei , SU Zhan-wei , XIANG Yu. Optimization of the Loading Coal Operation[J]. Gansu Metallurgy, 2013, 35(1): 84-85,102
Authors:ZHANG Jun    JIN Ying-wu    LIU Si-pei    SU Zhan-wei    XIANG Yu
Affiliation:(Anyang Iron & Steel Stock Co.Ltd.,Anyang 455000,China)
Abstract:In view of the problem of large coke pushing current and charging "cutaway" in the carbonization chamber,optimization and improvement were implemented on loading operating system,and the improvement and optimization of processing were made.The coal capacity increased by 0.5~1 tons / furnace,without " cutaway " in loading coal,and the coke gas consumption per ton was decreased.
Keywords:loading coal  operation  cutaway  optimization
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号