首页 | 本学科首页   官方微博 | 高级检索  
     

BP算法和对称ARCH类模型对股市波动性预测的实证比较
引用本文:庞素琳,徐建闽,黎荣舟. BP算法和对称ARCH类模型对股市波动性预测的实证比较[J]. 控制理论与应用, 2006, 23(4): 658-662
作者姓名:庞素琳  徐建闽  黎荣舟
作者单位:暨南大学,数学系,广东,广州,510632;华南理工大学,交通学院,广东,广州,510640
基金项目:国家自然科学基金资助项目(60574069),广东省自然科学基金资助项目(31906),广东省科技厅攻关项目(2004B10101033),广州市科技局攻关项目(2004Z3-D0231),广东省软科学研究项目(2005B70101044)
摘    要:利用我国深圳股票市场的实际数据,建立了相应的BP算法网络预测模型和ARCH(1),GARCH(1,1)预测模型,分别用来对深成指数每个周末收盘价的波动性进行预测.研究表明,BP算法对样本外观测值的上凸曲线拟合得较好,对下凸曲线的拟合效果较差;ARCH(1)和GARCH(1,1)则反之,其预测曲线对样本外观测值的下凸曲线拟合效果都较好,但对上凸曲线的拟合效果都较差.通过采用6种常用的预测误差统计量:平均误差、平均绝对误差、均方根误差、平均绝对比率误差、Akaike信息准则、Baves信息准则对样本外数据的预测结果进行检验,BP算法的预测效果最好,ARCH(1)模型次之,GARcH(1,1)模型偏差.

关 键 词:BP算法  ARCH(1)模型  GARCH(1,1)模型  波动性
文章编号:1000-8152(2006)04-0658-05
收稿时间:2004-09-14
修稿时间:2004-09-142005-12-21

Comparison:the volatility forecasting of BP algorithm and symmetric ARCH model to stock market
PANG Su-lin,XU Jian-min,LI Rong-zhou. Comparison:the volatility forecasting of BP algorithm and symmetric ARCH model to stock market[J]. Control Theory & Applications, 2006, 23(4): 658-662
Authors:PANG Su-lin  XU Jian-min  LI Rong-zhou
Affiliation:Department of Mathematics, Jinan University, Guangzhou Guangdong 510632, China; College of Traffic and Communications, South China University of Technology, Guangzhou Guangdong 510640, China
Abstract:Three forecasting models, called BP algorithm, ARCH(1) and GARCH(1,1), are established based on the actual data of Shenzhen stock market, China. The proposed three models are respectively used to predict the volatility of the weekly closing price of the composition indexes in Shenzhen Stock Exchange. Furthermore, six common statistical methods of the forecasting error, i.e., mean error (ME), mean absolute error (MAE), root mean squared error (RMSE), mean absolute percentage error (MAPE), Akaike's information criterion (AIC) and Bayesian information criterion (BIC) are used to test the forecasting results of the out-of-sample data. The results show that the forecasting result of BP algorithm is the best, the ARCH(1) model takes the second place and the GARCH(1,1) model is the worst.
Keywords:BP algorithm  ARCH(1) model  GARCH(1  1) model  volatility
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《控制理论与应用》浏览原始摘要信息
点击此处可从《控制理论与应用》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号