深圳俊园超高层建筑结构工程施工
引用本文:石伟国,刘秋生. 深圳俊园超高层建筑结构工程施工[J]. 建筑技术, 1999, 30(11): 761-764
作者姓名:石伟国  刘秋生
作者单位:江苏省建筑安装工程股份有限公司深圳分公司
摘    要:深圳俊园工程地下3层,地上47层,高161m。施工中采用了人工挖孔桩加预应力错杆深基坑支护,大体积混凝土三掺技术、桩墙合一、颈性钢筋混凝土结构、梁式了板式转换层等技术,效果良好,经济效益明显。

关 键 词:超高层建筑 粗墙合一 转换层 建筑结构工程
修稿时间:1999-07-06

THE SUPER-HIGHRISE BUILDING CONSTRUCTION OF THE SHENZHEN JUNYUAN PROJECT
SHI Weiguo LIU Qiusheng. THE SUPER-HIGHRISE BUILDING CONSTRUCTION OF THE SHENZHEN JUNYUAN PROJECT[J]. Architecture Technology, 1999, 30(11): 761-764
Authors:SHI Weiguo LIU Qiusheng
Affiliation:SHI Weiguo LIU Qiusheng
Abstract:The super-highrise building construction of the Shenzhen Junyuan project has been designed of a basement with 3-storey deep under ground and a building with 47-storey high above ground and a total height of 161m.During its construction,there are several technological methods being adopted as the following,namely:1,manual artificial bored piles plus prestressed concrete anchor bars to support its deep foundation pit 2,mass concrete with 3-admixture technology 3,an integration of pile-wall combination 4,rigid R.C.structure and 5,beam type and thick slab type with storey transfer technology.All of these have been proved of good results and achieved economic benefits.
Keywords:super-highrise building  an integration of pile-wall combination  storey transfer technology  