输变电项目后评价因素权重的确定
引用本文:吕雷.输变电项目后评价因素权重的确定[J].煤炭技术,2010,29(8).
作者姓名:吕雷
作者单位:西京学院,西安,710123
摘    要:在确定输变电项目后评估中各影响因素的权重中,针对专家权重未知的情况下,文章引入有序加权算子对由专家判断矩阵所导出的排序权值进行集结,得到最后的各影响因素的综合权值,最后实例说明该方法在输变电项目后评价因素权重确定中的可行性。

关 键 词:输变电项目后评价  权重  有序加权算子

Determining the Weight of Factors in Power Transmission Project Post-project Evaluation
Lü Lei.Determining the Weight of Factors in Power Transmission Project Post-project Evaluation[J].Coal Technology,2010,29(8).
Authors:Lü Lei
Abstract:In the process of determining the weights of factors in the power transmission project post-project evaluation,aim to the weight is unknown for the experts,this paper introduces the ordered weighted operator aggregated the weights,which export from the judgment matrix by the experts,and obtained the finally combination weights of the factors,finally,an example shows that this method is feasibility for determining the weight of factor in the power transmission project post-project evaluation.
Keywords:power transmission project post-project evaluation  weight  OWA operator