金安桥水电站定子定位筋安装质量控制
引用本文:罗涛.金安桥水电站定子定位筋安装质量控制[J].水力发电,2011,37(1).
作者姓名:罗涛
作者单位:长江三峡经济技术发展有限公司金安桥监理部,云南丽江,674104
摘    要:目前国内大型水轮发电机组定子基本采用现场叠装的方式,其中定位筋安装是定子叠装的重要工序,因此其质量控制显得尤为重要,根据安装经验和有关资料简要介绍了金安桥水电站定子定位筋的安装工艺、安装过程及质量控制要点.

关 键 词:定位筋  安装工艺  质量控制  金安桥水电站

Quality Control on the Installation of Generator Stator's Position Bar in Jin'anqiao Hydropower Station
Luo Tao.Quality Control on the Installation of Generator Stator's Position Bar in Jin'anqiao Hydropower Station[J].Water Power,2011,37(1).
Authors:Luo Tao
Affiliation:Luo Tao(Jin'anqiao Supervision Department,Yangtze Three Gorges Technology & Economy Development Co.,Ltd.,Lijiang 674104,Yunnan,China)
Abstract:For field laminated assembly of large-scale hydro turbine generator stator,the installation of position bars is a key process and its quality control is particularly important.The installation processes,procedures and key quality controls are introduced for the position bar installation of generator stator in Jin'anqiao Hydropower Station.
Keywords:positioning bar  installation process  quality control  Jin'anqiao Hydropower Station  