首页 | 本学科首页   官方微博 | 高级检索  
     

CIM模型在地铁施工安全风险评估中的应用
引用本文:李小浩,宋永发.CIM模型在地铁施工安全风险评估中的应用[J].工程管理学报,2010,0(5):513-516.
作者姓名:李小浩  宋永发
作者单位:大连理工大学 土木水利学院
摘    要:文章对国内近年的地铁施工安全事故进行了统计分析,从事故原因的角度建立了地铁施工安全风险评价体系,构建了地铁施工安全风险CIM评估模型。运用这一模型对大连地铁工程一号线一期102标段进行了施工安全风险评估验证。结果表明,CIM模型在地铁风险评估中具有有效性和可操作性。

关 键 词:地铁  施工安全  风险评估  CIM评估模型

Application of the Controlled Interval and Memory Model in Safety Risk Evaluation of Subway Constructions
LI Xiao-hao,SONG Yong-fa.Application of the Controlled Interval and Memory Model in Safety Risk Evaluation of Subway Constructions[J].Journal of Engineering Management,2010,0(5):513-516.
Authors:LI Xiao-hao  SONG Yong-fa
Affiliation:School of Civil Engineering and Hydraulic,Dalian University of Technology
Abstract:The statistical analysis was carried out on subway construction accidents in recent years in China. The safety risk evaluation system for subway constructions was set up from the view of the accidents. The evaluation model for Controlled Interval and Memory (CIM) in subway construction safety risk was developed. The model was verified on the construction of bid lot 102 in first-stage project of Dalian subway line 1 in China. The result shows the operability of CIM model in subway risk evaluation.
Keywords:subway  construction safety  risk evaluation  controlled interval and memory evaluation model
本文献已被 CNKI 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号