首页 | 本学科首页   官方微博 | 高级检索  
     

昆山市北区污水处理厂二期工程及深度处理工程设计
引用本文:王文生,赵翔.昆山市北区污水处理厂二期工程及深度处理工程设计[J].广东化工,2009,36(8):299-301.
作者姓名:王文生  赵翔
作者单位:中国市政工程中南设计研究院,上海,200122
摘    要:介绍了昆山市北区污水处理厂二期工程及深度处理工程的设计规模、工艺流程、各构筑物设计参数。

关 键 词:污水处理厂  工艺流程  设计参数  深度处理

The Design of the Second Phase Project and Advanced Treatment of the Treatment Plant in the North Region of Kunshan
Wang Wensheng,Zhao Xiang.The Design of the Second Phase Project and Advanced Treatment of the Treatment Plant in the North Region of Kunshan[J].Guangdong Chemical Industry,2009,36(8):299-301.
Authors:Wang Wensheng  Zhao Xiang
Affiliation:(Central and Southern China Municipal Engineering Design & Research Institute, Shanghai 200122, China)
Abstract:The paper introduced the design scale, technological process, design parameters of the structures of the second phase project and advanced treatment of the treatment plant in the north region of Kunshan.
Keywords:sewage treatment plant  technological process  design parameters  advanced treatment
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号