云龙水库施工期下游供水设计
引用本文:李蜀. 云龙水库施工期下游供水设计[J]. 水利水电技术, 2005, 36(5): 62-63,67
作者姓名:李蜀
作者单位:云南省水利水电勘测设计研究院,云南,昆明,650021
摘    要:着重介绍云龙水库施工期下游供水设计,根据工程特点,较好地解决泄洪导流隧洞施工期、大坝施工期、水库蓄水、导流隧洞封堵施工期等下游供水问题,施工方法简单,确保了下游供水,取得了较好的社会和经济效益.

关 键 词:下游供水  施工期  云龙水库
文章编号:1000-0860(2005)05-0062-03

Design of downstream water supply during construction of Yunlong Reservoir
LI Shu. Design of downstream water supply during construction of Yunlong Reservoir[J]. Water Resources and Hydropower Engineering, 2005, 36(5): 62-63,67
Authors:LI Shu
Abstract:The design of the downstream water supply during the construction of Yunlong Reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking-up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit.
Keywords:downstream water supply  construction period  Yunlong Reservoir