江坪河水电站坝址深层风化岩体对坝型选择的影响研究
引用本文:罗崇宏,梁承运,李学政,胡大可. 江坪河水电站坝址深层风化岩体对坝型选择的影响研究[J]. 水力发电, 2020, 46(6): 35-38,107
作者姓名:罗崇宏  梁承运  李学政  胡大可
作者单位:中国电建集团中南勘测设计研究院有限公司, 湖南 长沙 410014;中国电建集团中南勘测设计研究院有限公司, 湖南 长沙 410014;中国电建集团中南勘测设计研究院有限公司, 湖南 长沙 410014;中国电建集团中南勘测设计研究院有限公司, 湖南 长沙 410014
摘    要:江坪河水电站坝址河谷呈"V"形,宽高比约1. 8,具备修筑高拱坝的地形条件,但坝址两岸尤其是右岸谷坡在进入弱风化下限或微风化岩体后,出现范围较大的深层风化岩体。通过分析深层风化岩体对拱坝和面板堆石坝2种坝型坝基变形、坝肩及边坡稳定的不同影响表明,坝址区地质条件对修建拱坝的适宜性较差,工程处理费用高,可实施性及实施效果有待论证;面板堆石坝虽然施工条件较差,但对地基要求低,对地质条件适宜性较好,工程处理难度较小,为可选坝型。

关 键 词:深层风化岩体  坝型选择  适宜性  江坪河水电站

Influence Analysis of Deep Weathered Rock Mass on Dam Type Selection of Jiangpinghe Hydropower Station
LUO Chonghong,LIANG Chengyun,LI Xuezheng,HU Dake. Influence Analysis of Deep Weathered Rock Mass on Dam Type Selection of Jiangpinghe Hydropower Station[J]. Water Power, 2020, 46(6): 35-38,107
Authors:LUO Chonghong  LIANG Chengyun  LI Xuezheng  HU Dake
Affiliation:(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,Hunan,China)
Abstract:The river valley at the dam site of Jiangpinghe Hydropower Station is V-shaped with a width-height ratio of about 1. 8. It has the topographical conditions for building a high arch dam. However, when the valley slopes on both sides of the dam site, especially on the right bank, enters into the lower limit of weak weathering or slightly weathered rock mass, a large range of deep weathered rock mass appears. The influences of deep weathered rock mass on dam foundation deformation and dam abutment and slope stability of arch dam and face rockfill dam are analyzed respectively. The results show that,( a) the geological conditions in dam site area are not suitable for the construction of arch dam, the engineering treatment cost is higher,and the feasibility and the implementation effect need to be further demonstrated;and( b) although the construction conditions of face rockfill dam are poor, the requirements of face rockfill dam for the foundation are low, the suitability for the geological conditions is better, and the engineering treatment is less difficult, so the face rockfill dam is an option.
Keywords:deep weathered rock mass  dam type selection  suitability  Jiangpinghe Hydropower Station