100MW机组通流改造现场实施 |
| |
引用本文: | 房贵明. 100MW机组通流改造现场实施[J]. 热力透平, 2002, 0(1): 43-48 |
| |
作者姓名: | 房贵明 |
| |
作者单位: | 东方汽轮机厂工艺处,四川,德阳,618201 |
| |
摘 要: | 对 10 0MW汽轮机通流改造中的重点、难点进行了分析论述 ,并结合玛纳斯电厂 10 0MW机组改造的成功经验进行讨论。
|
关 键 词: | 100MW汽轮机 通流改造 现场 实施 |
文章编号: | 1671-0851(2002)01-0043-06 |
修稿时间: | 2001-05-14 |
Field Carry-out of Blade Path Retrofitting for 100MW Steam Turbine |
| |
Abstract: | The key and difficult points in the retrofitting of steam path of 100MW steam turbine are analyzed and discussed, and the successful experience of 100MW unit retrofitted in Manasi Power Plant is also discussed in this paper. |
| |
Keywords: | MW steam turbine blade path retrofitting site carry out |