首页 | 本学科首页   官方微博 | 高级检索  
     

桂林某工程干挂石材幕墙施工实践
引用本文:吕立,杜杰. 桂林某工程干挂石材幕墙施工实践[J]. 山西建筑, 2009, 35(4)
作者姓名:吕立  杜杰
作者单位:1. 桂林市建设监理公司,广西桂林,541001
2. 桂林市安厦房地产开发有限责任公司,广西桂林,541002
摘    要:结合桂林某工程干挂石材幕墙施工实例,阐述了施工过程中测量放线、龙骨安装、避雷及层间防火安装、石材安装、石材面层打胶、清洁及整体验收等技术要点,同时提出了质量保证措施,以使幕墙施工质量满足规范要求。

关 键 词:石材幕墙  施工技术  质量要求  措施

The dry fasten stone curtain wall construction practice of a engineering in Guilin
LV Li,DU Jie. The dry fasten stone curtain wall construction practice of a engineering in Guilin[J]. Shanxi Architecture, 2009, 35(4)
Authors:LV Li  DU Jie
Affiliation:LV Li DU Jie
Abstract:Combined with dry fasten stone curtain wall construction example of a engineering in Guilin,the technology points of measuring setting put,keel installment,lighting protection and interlamination fire prevention installment,stone material installment,stone surface sizing,clear and whole check and acceptance during construction process were illustrated and quality assurance measures were proposed simultaneously,so as to make curtain wall construction quality satisfy standard requirement.
Keywords:stone curtain wall  construction technology  quality requirement  measures
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号