首页 | 本学科首页   官方微博 | 高级检索  
     

湖泊区换填地段高填路堤沉降变形拟合分析及预测研究
引用本文:黄兴,刘兵,李小青. 湖泊区换填地段高填路堤沉降变形拟合分析及预测研究[J]. 水电能源科学, 2013, 31(5): 134-137
作者姓名:黄兴  刘兵  李小青
作者单位:华中科技大学 土木工程与力学学院, 湖北 武汉 430074;广东省长大公路工程有限公司, 广东 广州 511431;华中科技大学 土木工程与力学学院, 湖北 武汉 430074;华中科技大学 土木工程与力学学院, 湖北 武汉 430074
基金项目:国家自然科学基金资助项目(51278391)
摘    要:基于高填路堤现场实时沉降观测数据,采用双曲线法、指数曲线法、Asaoka法等分别对武汉天河机场第二通道高速公路S6标K12+300断面路堤沉降变形进行拟合分析和预测,并对拟合预测结果进行方差检验和关联度分析,以揭示高填路堤沉降变化规律,探讨实测沉降和曲线拟合与预测之间的关联。结果表明,指数曲线法预测结果精度高,效果最好;对于现场实时观测数据的处理分析,应以填筑后期的沉降观测值为主,尽量减少选用填筑初期的观测信息,建议采用150 d实测数据进行沉降预测及变形控制。

关 键 词:高填路堤; 曲线拟合; 最终沉降; 预测分析; 关联度

Research on Curve Fitting and Prediction of High-filling Embankment Settlement
HUANG Xing,LIU Bing and LI Xiaoqing. Research on Curve Fitting and Prediction of High-filling Embankment Settlement[J]. International Journal Hydroelectric Energy, 2013, 31(5): 134-137
Authors:HUANG Xing  LIU Bing  LI Xiaoqing
Affiliation:School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China; Guangdong Provincial Changda Highway Engineering Co., Ltd., Guangzhou 511431, China;School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China;School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China
Abstract:Based on the real-time settlement monitoring data of high-filling embankment, hyperbolic method, index curve method and Asaoka method are used to analyze and predict the embankment settlement of a highway project, which are the K12 + 300 cross section of S6 part, located in the second channel of Tianhe airport in Wuhan City. In order to obtain the settlement regular of high-filling embankment and the relationship between the real-time monitoring data and the predicted data, variance test and correlation analysis are used to analyze the prediction results. The results show that the accuracy of index curve method is higher and the effect is better than others; the later settlement data is suggested in the data processing of the real-time measured value rather than the early information, and the 150 days real-time settlement data is more suitable to predict the settlement and control the deformation.
Keywords:high-filling embankment   curve fitting   final settlement   prediction analysis   correlation degree