首页 | 本学科首页   官方微博 | 高级检索  
     

混凝土筒体先于外钢框架施工阶段结构分析
引用本文:张坚,陈国成.混凝土筒体先于外钢框架施工阶段结构分析[J].结构工程师,2005,21(2):22-30.
作者姓名:张坚  陈国成
作者单位:华东建筑设计研究有限公司,上海,200002;上海市第一建筑有限公司,上海,200135
摘    要:超高层建筑结构体系发展的一个方向是采用混凝土核芯筒 外围钢框架的混合结构体系。该体系在施工中往往采用混凝土核芯筒领先外围钢框架的整体提升法。针对由此产生的设计工况与施工工况不符的问题,结合笔者的一些工程实践,提出混合结构施工阶段设计的一些方法。

关 键 词:混合结构  施工工况  领先施工

Structural Design of Hybrid Structures When Concrete Tube is First-Built
ZHANG Jian,Chen Guocheng.Structural Design of Hybrid Structures When Concrete Tube is First-Built[J].Structural Engineers,2005,21(2):22-30.
Authors:ZHANG Jian  Chen Guocheng
Abstract:Hybrid structure with concrete tube core is one of the typical structure of tall buildings. When we build this kind of the structure, the concrete tube is often built in advance. So it brings us a question that the building state is not quite the same as the design state. The fact asks designer to consider the building state but without detail method. In this paper we present a method to determine how many stories of concrete tube are reasonable to be built before steel frame is settled.
Keywords:hybrid structure  building state  build in advance  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号