平班水电站左岸重力坝常态混凝土配合比优化设计
引用本文:袁瑶才. 平班水电站左岸重力坝常态混凝土配合比优化设计[J]. 广西水利水电, 2006, 0(3): 7-9,22
作者姓名:袁瑶才
作者单位:广西水电工程局,南宁,530001
摘    要:根据平班水电站所采用原材料的特性,经过混凝土配合比优化设计试验,应用混凝土"双掺"技术及粉煤灰"超代"技术,揭示了各原材料相互间的组合及变化规律,改善和提高混凝土的技术性能,达到保证满足工程技术要求以及经济、节约目的.

关 键 词:混凝土  配合比  优化  平班水电站
文章编号:1003-1510(2006)03-0007-03
收稿时间:2006-06-06
修稿时间:2006-06-06

Optimization of normal concrete mix proportion for left-bank gravity dam of Pingban Hydropower Plant
YUAN Yao-cai. Optimization of normal concrete mix proportion for left-bank gravity dam of Pingban Hydropower Plant[J]. Gx Water Resources & Hydropower Engineering, 2006, 0(3): 7-9,22
Authors:YUAN Yao-cai
Affiliation:Guangxi Water and Power Construction Bureau, Nanning 530001, China
Abstract:According to the characteristics of raw materials used by Pingban Hydropower Plant, based on concrete mix proportion optimization design and test, concrete double-mixing technique and fly ash extra-substitute technique are applied to reveal the combination of raw materials and change rule, improve the technical property of concrete, satisfy the engineering technical requirements with less cost.
Keywords:Concrete   mix proportion   optimization   Pingban Hydropower Plant