首页 | 本学科首页   官方微博 | 高级检索  
     


Assigning multiple activities to work shifts
Authors:Quentin Lequy  Mathieu Bouchard  Guy Desaulniers  Fran?ois Soumis  Beyime Tachefine
Affiliation:(1) System Engineering Team, Samsung Electronics, SAN #16, Banwol-Dong, Taean-Eup Hwasung-City, Geonggi-Do, Korea;(2) Department of Industrial Engineering, Korea Advanced Institute of Science and Technology (KAIST), 373-1, Gusung-dong, Yusung-gu, Daejon, 305-701, Korea
Abstract:In some companies such as large retail stores, the employees perform different activities (e.g., cashier or clerk in a specific department) to respond to a customer demand for each activity that varies over the planning horizon and must be fulfilled as soon as possible. For a given time period, this demand translates into an ideal number of employees required for the corresponding activity. During a work shift, an employee can be assigned to several activities that are interruptible at any time and subject to operational constraints (required skills, minimum and maximum assignment durations). Given work shifts already assigned to the employees, the multi-activity assignment problem (MAAP) consists of assigning activities to the shifts such that the activity demands are satisfied as best as possible over the planning horizon. In this paper, we propose three integer programming models for the MAAP and develop various heuristics based on mathematical programming techniques. Computational results obtained on randomly generated MAAP instances show that a heuristic column generation method embedded into a rolling horizon procedure provides the best results in general.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号