首页 | 本学科首页   官方微博 | 高级检索  
     

取土场原位电渗处治过湿填料的施工方法
引用本文:岳佩霞.取土场原位电渗处治过湿填料的施工方法[J].山西建筑,2010,36(32):297-298.
作者姓名:岳佩霞
作者单位:河北省交通规划设计院,河北石家庄050011
摘    要:针对某高速公路取土场原位电渗处治过湿填料的施工方法进行了介绍,分别阐述了在取土场原位电渗处治过湿填料的施工设备、材料及其施工要点等内容,为电渗技术的进一步推广奠定了基础。

关 键 词:取土场  电渗  过湿土填料  施工要点

Construction method of treating over-wet filler with insitu electricity in borrow areas
YUE Pei-xia.Construction method of treating over-wet filler with insitu electricity in borrow areas[J].Shanxi Architecture,2010,36(32):297-298.
Authors:YUE Pei-xia
Affiliation:YUE Pei-xia
Abstract:The paper introduces the construction method to treat the over-wet filler with insitu electricity in borrow areas on some expressway,illustrates the construction equipment,the materials and the construction contents of the insitu electricity treatment for the over-wet filler in borrow areas,so as to lay the foundation for the further extended application of the electroosmosis.
Keywords:borrow area  electroosmosis  over-wet filler  construction point
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号