银川热电公司一期脱硫系统问题分析
引用本文:高瑞明,王秀琴. 银川热电公司一期脱硫系统问题分析[J]. 宁夏电力, 2010, 0(1): 60-62
作者姓名:高瑞明  王秀琴
作者单位:宁夏银川热电有限责任公司,宁夏,银川市,750002
摘    要:针对银川热电公司一期脱硫系统,在循环灰输送过程不稳定性和瞬间流量过大,影响系统连续和稳定运行的问题,分析了系统运行不稳定的相关因素,提出了相应的改进措施。

关 键 词:脱硫  分析  热电厂

Problem analysis and solution for the desulfurization system in the first period construction project of Yinchuan Cogeneration Co.,Ltd.
GAO Rui-ming,WANG Xiu-qing. Problem analysis and solution for the desulfurization system in the first period construction project of Yinchuan Cogeneration Co.,Ltd.[J]. Ningxia Electric Power, 2010, 0(1): 60-62
Authors:GAO Rui-ming  WANG Xiu-qing
Affiliation:Ningxia Yinchuan Cogeneration Co./a>;Ltd./a>;Yinchuan Ningxia 750011/a>;China
Abstract:Aiming at the problems of the smoke ash circulating feeding process unsteadiness and influencing the desulfurization system continuous and steady operationin in the first period of Yinchuan Cogeneration Co.,Ltd.,analyzes the factors caused the system operation unsteadiness,puts forward the related measures.
Keywords:desulfurization  analysis  cogeneration plant  