首页 | 本学科首页   官方微博 | 高级检索  
     

预应力箱梁张拉施工质量控制要点
引用本文:姚永春.预应力箱梁张拉施工质量控制要点[J].山西建筑,2010,36(26):199-200.
作者姓名:姚永春
作者单位:山西路桥第一工程有限责任公司,山西,太原,030006
摘    要:指出预应力钢绞线的张拉施工是后张预应力箱梁施工中的关键技术,分析了预应力钢绞线张拉前的准备工作及张拉程序,总结了预应力钢绞线张拉完成后的相应工作,从而为预应力箱梁张拉施工积累经验。

关 键 词:预应力  钢绞线  张拉  质量控制

Quality control points of prestressed concrete box girder tensioning construction
YAO Yong-chun.Quality control points of prestressed concrete box girder tensioning construction[J].Shanxi Architecture,2010,36(26):199-200.
Authors:YAO Yong-chun
Affiliation:YAO Yong-chun
Abstract:It points out that tensioning steel wire strand is the key technique in post-tensioned box girder construction, arlalyzes preparation and tensioning procedures before the pre-tensioning steel wire strand tensioning, summarizes relevant work after the prestressed steel wire strand tension. Thus, it has accumulated experience for prestressed concrete box girder tensioning construction.
Keywords:prestressed force  steel wire strand  tensioning  quality control
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号