龙滩工程关键设备国产化的实施和体会
引用本文:初曰亭,张强.龙滩工程关键设备国产化的实施和体会[J].水电站机电技术,2011(5):1-4,96.
作者姓名:初曰亭  张强
作者单位:龙滩水电开发有限公司;
摘    要:龙滩水电站是目前我国已投产电站中仅次于三峡的第二大水电站。在工程机电建设方面,龙滩工程本着“客观、实用、经济”的理念,在推动水电站关键设备国产化、振兴民族工业方面进行了积极的探索和尝试。首次实现了700MW级水轮发电机组、500kV三相组合式变压器、500kV交联聚乙烯绝缘电缆、巨型水电站监控系统设备等关键设备的国产化...

关 键 词:关键设备  国产化  水轮发电机组  组合变压器  交联聚乙烯绝缘电缆

Practice and experience on key equipment localization for Longtan project
Authors:CHU Yue-ting  ZHANG Qiang
Affiliation:CHU Yue-ting,ZHANG Qiang(Longtan Hydropower Development Co.,Ltd.,Tian'e 547300,China)
Abstract:Longtan Hydropower Station is the second largest hydropower station after Three Gorges in those have put into production in China.Based on the idea of objective,practical and economic,an exploratory investigation to promote the key equipment localization and the national industry revitalization was conducted.The localization of key equipment such as 700MW hydraulic generating unit,500kV three-phase composite transformer,500kV crosslinked polyethylene insulated cable and monitoring system for giant hydropowe...
Keywords:key equipment  localization  hydraulic generating unit  composite transformer  crosslinked polyethylene cable  