首页 | 本学科首页   官方微博 | 高级检索  
     

八堡堤Ⅱ标射水造墙施工后渗漏原因分析
引用本文:谢为江,游文荪,彭小玲. 八堡堤Ⅱ标射水造墙施工后渗漏原因分析[J]. 江西水利科技, 2008, 34(2): 122-127
作者姓名:谢为江  游文荪  彭小玲
作者单位:河海大学水电学院,江苏南京210098;江西省水利科学研究院,江西南昌330029;江西省南昌市水利电力建设公司,江西南昌,330009
摘    要:针对江西省廖坊水利枢纽工程库区防护工程八堡堤Ⅱ标射水造墙施工后仍存在渗漏的原因进行了分析,并找出了主要缺陷部位产生渗漏的原因.

关 键 词:射水造墙  渗漏  墙体开叉  预留槽孔间距

Analysis of the seepage reason of Babao Dyke after making cutoff wall by water jetting
XIE Wei-jiang,YOU Wen-sun,PENG Xiao-ling. Analysis of the seepage reason of Babao Dyke after making cutoff wall by water jetting[J]. Jiangxi Hydraulic Science & Technology, 2008, 34(2): 122-127
Authors:XIE Wei-jiang  YOU Wen-sun  PENG Xiao-ling
Abstract:The seepage reason of Babao Dyke of the protection engineering of Liaofang Reservoir area in Jiangxi province is analyzed after making cutoff wall by water jetting.The seepage season of the main defect localization of cutoff wall is proposed in this paper.
Keywords:Making cutoff wall by water jetting  Seepage  Cutoff wall breaking  Reserve the slot hole distance
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号