Sequence Planning for Electrical Construction
Authors:Michael J Horman  Matthew P Orosz  David R Riley
Affiliation:1Assistant Professor of Architectural Engineering, Penn State Univ., 211 Engineering Unit A, University Park, PA 16802.
2Project Manager, Truland Systems Corporation.
3Associate Professor of Architectural Engineering, Penn State Univ., 220 Engineering Unit A, University Park, PA 16802.
Abstract:The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.
Keywords:Construction management  Managers  Planning  Contractors  Electrical systems  