首页 | 本学科首页   官方微博 | 高级检索  
     

平衡固井技术在程1井中的应用
引用本文:周代,何德清,黄后初,李保峰,宋福军,聂光毅. 平衡固井技术在程1井中的应用[J]. 内蒙古石油化工, 2010, 36(9): 143-145
作者姓名:周代  何德清  黄后初  李保峰  宋福军  聂光毅
作者单位:1. 河南油田分公司开发事业部
2. 河南石油勘探局钻井工程公司
3. 南阳二机石油装备(集团)有限公司,河南,南阳
摘    要:程1井在钻井过程中发现了较好的油气显示,为了保证该井顺利地进行固井施工并确保固井质量合格,通过室内对高效能冲洗液性能的改进、加重隔离液体系的优选、防窜水泥浆体系的筛选和隔离液与钻井液、冲洗液和水泥浆相容性实验,以及查阅"既涌又漏"井固井技术资料[1,2],进行总体的分析优化,形成了该井的平衡压力固井施工技术方案,较好的解决了该井"既涌又漏"而造成的固井施工液柱密度窗口小、井壁油污清洗困难、水泥浆顶替效率低的难题,确保了该井固井施工安全和固井质量合格。其中加重隔离液和高效能冲洗液首次在河南油田使用,为以后类似复杂井固井施工提供了宝贵经验。

关 键 词:程1井  平衡压力固井  水泥浆  技术措施

Cementing a balanced application of technology in the cheng 1 wells
ZHOU Dai,HE De-qing,HUANG Hou-chu,LI Bao-feng,SONG Fu-jun,NIE Guang-yi. Cementing a balanced application of technology in the cheng 1 wells[J]. Inner Mongulia Petrochemical Industry, 2010, 36(9): 143-145
Authors:ZHOU Dai  HE De-qing  HUANG Hou-chu  LI Bao-feng  SONG Fu-jun  NIE Guang-yi
Affiliation:1.Henan Oilfield Branch of Nanyang in Henan Province Department of Development; 2.Henan Petroleum Exploration Bureau,Henan Nanyang Drilling Engineering Company;3.Nanyang second machine oil equipment(Group) Co.,Ltd.Henan Nanyang)
Abstract:Henan Cheng 1 Well is a pre-field trial pits,found in the drilling of oil and gas well has shown that,for better and the development of proven reserves in the block,exploration and development department decided that the use of cementing wells Radio Hole Completion program.In order to ensure the smooth running of the well cementing cementing quality of construction and to ensure that qualified through the interior of the fluid properties of high-performance improvements,increase the liquid separation system optimization,anti-channeling the mud water filter system with the drilling fluid and isolation,washing liquid and water slurry compatibility test,and inspection "both Chung and leakage",Well Cementing Technical Data.Analysis of overall optimization,the formation of the cementing of the well construction technology program,the better solution in the wells "both Chung and leakage" caused by the construction of the cement column density of the window small,difficult to clean oil-wall,water,mud replace low-efficiency problem,to ensure that the construction of the safety and well cementing cementing quality.Increase the isolation in which high-performance liquid and fluid use of the first oil field in Henan,for the future construction of a similar complexity of well cementing provided valuable experience.
Keywords:Cheng 1 Well  Balanced Way Pressure  Slurry Solid  Technical Measures.
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号