首页 | 本学科首页   官方微博 | 高级检索  
     


Investigation and adjustment of the pilot power unit equipped with a K-300-170-1R turbine produced by OAO Silovye Mashiny
Authors:A S Lisyanskii  E M Sukhorukov  V V Nazarov  M I Shklyarov  A M Mironov  V D Nasredinov  A A Ryzhkov
Affiliation:1. OAO Silovye Mashiny-Leningrad Metal Works, ul. Vatutina 3A, St. Petersburg, 195009, Russia
Abstract:Results obtained from investigations and adjustment works on a K-300-170-1R steam turbine carried out concurrently with a comprehensive set of works (adjustment of the support and suspension system of pipelines, analysis of thermal expansions of the cylinders and operating conditions of the bearings, optimization of the steam admission system, balancing works, and others) aimed at improving the turbine unit vibration performance are presented. The use of such integrated approach makes it possible to efficiently settle matters concerned with removing increased vibration of a turbine unit.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号