首页 | 本学科首页   官方微博 | 高级检索  
     

南水北调中线京石段应急供水工程左岸排水设计
引用本文:靳沾,宋宝生,王海英.南水北调中线京石段应急供水工程左岸排水设计[J].水利水电技术,2005,36(5):42-43,45.
作者姓名:靳沾  宋宝生  王海英
作者单位:水利部,河北水利水电勘测设计研究院,天津,300250
摘    要:南水北调中线工程京石段应急供水工程左岸排水建筑物是总干渠的重要组成部分,亦是解决左岸洪、沥水出路的关键工程,直接影响总干渠的安全通水.主要介绍了左岸排水建筑物规模确定、轴线选择、建筑物类型确定、进出口型式选择及布置、建筑物结构型式选择.

关 键 词:南水北调中线工程  京石段  左岸排水工程
文章编号:1000-0860(2005)05-0042-03

Design of drainage works on left bank of emergency water supply project: Mid-route of South-to-North Water Transfer Project
JIN ZHAN,SHONG Bao-sheng,WANG Hai-ying.Design of drainage works on left bank of emergency water supply project: Mid-route of South-to-North Water Transfer Project[J].Water Resources and Hydropower Engineering,2005,36(5):42-43,45.
Authors:JIN ZHAN  SHONG Bao-sheng  WANG Hai-ying
Abstract:The drainage works on the left bank of the emergency water supply project of Beijing-Shijiazhuang section on the Mid-route of the South-to-North Water Transfer Project are the important parts of the main channel and the key projects of the outlets for both the flood and the water-logging, which have the direct impacts on the safety of the water transfer in the main channel. For the drainage works, the decisions on the sizes, the axes, and the types are introduced, and then the selections of the types, the layouts for the inlets and outlets and the structure of the works concerned are presented as well.
Keywords:Mid-route of South-to-North Water Transfer Project  Beijing-Shijiazhuang section  left bank drainage works
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号