首页 | 本学科首页   官方微博 | 高级检索  
     

上海崇明越江隧道衬砌整环试验加载方法研究
引用本文:王彪,刘祖华,鲁亮.上海崇明越江隧道衬砌整环试验加载方法研究[J].施工技术,2006(Z1).
作者姓名:王彪  刘祖华  鲁亮
作者单位:同济大学 上海200092
摘    要:上海崇明越江通道工程是上海市乃至国家重大基础设施建设工程之一,为了验证衬砌管片的承载能力和稳定性,故进行衬砌水平整环试验。本文详细介绍了衬砌整环试验的加载方法、相应加载设备的设计,并同以往衬砌试验的加载方法进行对比,为今后相关试验提供重要的参考依据。

关 键 词:隧道  衬砌管片  加载方法

A Loading Method of the Test for Lining Whole Wreath of Shanghai Chongming Tunnel
WANG Biao,LIU Zu-hua,LU Liang.A Loading Method of the Test for Lining Whole Wreath of Shanghai Chongming Tunnel[J].Construction Technology,2006(Z1).
Authors:WANG Biao  LIU Zu-hua  LU Liang
Abstract:The tunnel engineering of Shanghai-Chongming in Shanghai City is one of the national important foundation facilities development engineering.For verifying the loading ability and stability of lining segment,it' s necessary to do the lining whole wreath experiment.Compared with other tunnel lining tests,this paper emphasizes a testing loading method and the design of corresponding loading equipments of lining whole wreath in detail.It maybe helpful and presents some references to the similar tests in the future.
Keywords:tunnel  lining segment  loading method
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号