太原一电厂六期锅炉柱脚固定新方案的确立和实施
引用本文:史茂新. 太原一电厂六期锅炉柱脚固定新方案的确立和实施[J]. 山西电力, 1999, 0(2)
作者姓名:史茂新
作者单位:太原第一热电厂
摘    要:太原一电厂13号锅炉柱脚施工中,采用了取消埋设地脚螺栓的定位方法,缩短了工期,提高了效益,取得良好效果。

关 键 词:锅炉  柱脚  施工  定位方法

The Scheme and Its Implementation for Fixing the Column Footing of Boiler in the 6th-Phase Project of TTPP
Shi Maoxin. The Scheme and Its Implementation for Fixing the Column Footing of Boiler in the 6th-Phase Project of TTPP[J]. Shanxi Electric Power, 1999, 0(2)
Authors:Shi Maoxin
Affiliation:Taiyuan No.1 Thermal Power Plant
Abstract:During the construction of No 13 boiler in the sixth phase extension project of TTPP,the boiler footing positioning method without using embedment of anchor bolts was applied.The construction period was therefore shortened and a better effect was achieved.
Keywords:Bolier Construction Embedment of Anchor Bolts