首页 | 本学科首页   官方微博 | 高级检索  
     

EPC总承包模式下应用工程量清单招投标的探讨
引用本文:王伟平. EPC总承包模式下应用工程量清单招投标的探讨[J]. 电力建设, 2005, 26(1): 70-0
作者姓名:王伟平
作者单位:陕西省电力设计院 西安市,710054
摘    要:随着造价管理改革的深入 ,工程量清单计价方法在招投标活动中应用广泛 ,EPC总承包模式下设计单位应把握好所处的角色 ,积极推广和应用工程量清单计价方法 ,不断提高自身的管理水平、技术水平 ,更好地参与市场竞争。

关 键 词:工程量清单  EPC总承包  模式  
文章编号:1000-7229(2005)01-0070-03
收稿时间:2010-01-25
修稿时间:2004-07-20

Preliminary Discussion about Application of Bill of Quantities for Tender Offer and Bidding in EPC Mode
Wang Weiping. Preliminary Discussion about Application of Bill of Quantities for Tender Offer and Bidding in EPC Mode[J]. Electric Power Construction, 2005, 26(1): 70-0
Authors:Wang Weiping
Abstract:Along with reforming the rules of cost management, the bill of quantities pricing method is applied widely in public tender offer and bidding. Under EPC mode the design institutes should act as two parts well, tenderee or bidder. The design institutes also should extend and apply BOQ pricing method, continuously improve own management and technical ability in order to be able participate in the market competition better.
Keywords:bill of quantities  EPC general contract  mode  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力建设》浏览原始摘要信息
点击此处可从《电力建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号