首页 | 本学科首页   官方微博 | 高级检索  
     

弹性整体道床施工技术
引用本文:刘双友. 弹性整体道床施工技术[J]. 山西建筑, 2008, 34(13): 305-306
作者姓名:刘双友
作者单位:中铁隧道集团二处有限公司,河北三河,065201
摘    要:介绍了弹性整体道床,结合新武当山隧道整体道床工程实例,深入地探讨了弹性整体道床施工工艺,并总结了整体道床施工经验,以完善整体道床施工工艺,可为今后整体道床的施工提供数据支持。

关 键 词:弹性整体道床  施工技术  隧道  橡胶垫板
文章编号:1009-6825(2008)13-0305-02
修稿时间:2008-01-08

The construction technique of elastic integral ballast bed
LIU Shuang-you. The construction technique of elastic integral ballast bed[J]. Shanxi Architecture, 2008, 34(13): 305-306
Authors:LIU Shuang-you
Affiliation:LIU Shuang-you
Abstract:It introduces the elastic integral ballast bed,deeply discusses the construction technology of elastic integral ballast bed combined with the integral ballast bed project examples of new Wudang Mountain tunnel,and sums up the integral ballast bed construction experiences,to perfect the construction technology of integral ballast bed and supply data supporting to the construction of integral ballast bed after.
Keywords:elastic integral ballast bed  construction technique   tunnel  rubber shim
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号