首页 | 本学科首页   官方微博 | 高级检索  
     

洞巴水电站面板坝工程施工综述
引用本文:黄昌献,李从方. 洞巴水电站面板坝工程施工综述[J]. 红水河, 2007, 26(3): 7-11,17
作者姓名:黄昌献  李从方
作者单位:广西水电工程局,南宁,530001;广西水电工程局,南宁,530001
摘    要:文章介绍了洞巴水电站面板坝工程关键施工技术措施和科学、高效能的施工管理以供同行参考.

关 键 词:面板坝  施工  洞巴水电站
文章编号:1001-408X(2007)03-0007-05
收稿时间:2007-09-14
修稿时间:2007-09-14

Overview on Face Rock-fill Dam Construction for Dongba Hydropower Station
HUANG Chang-xian,LI Cong-fang. Overview on Face Rock-fill Dam Construction for Dongba Hydropower Station[J]. Hongshui River, 2007, 26(3): 7-11,17
Authors:HUANG Chang-xian  LI Cong-fang
Affiliation:Guangxi Hydroelectric Construction Bureau, Nanning 530001
Abstract:Critical face rock-fill dam engineering technology as well as scientific and high-efficient construction management in Dongba Hydropower Station construction are introduced in this paper and serve as a reference for similar projects.
Keywords:face rock-fill dam  construction  Dongba Hydropower Station
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号